Time plan
24.09 flight from
Warsaw
25.09 - 26.09.09. pick licences & visit & meeting FO/Papeete
Tahiti
27.09 - 28.09.09 flight to Australs Isl. - Tubuai
Isl & instal
29.09 - 12.10.09 QRV from Tubuai Isl.
14.10 flight back to
Papeete -Tahiti
15.10
flight to Marquesas Isl -
Nuku Hiva &
instal
16.10 - 22.10.09 QRV from
Nuku Hiva Isl.
23.10 - flight back to
Papeete -Tahiti
25.10 flight back to Warsaw
Equipment
160m vertical with 2 elevated
radials or 12 radials on the grund
80m 4 square (4 18m high verticals.Each 1 elavated radial or 12 radials on the ground.
-distance between verticals is 20,5m.
40m 2 faced verticals (distance 10m)
with 12 radials on the ground or 1 elevated each.
30m same as 40 or 4
square (distance 7m)
20-10m hex beam
20-10m vertical.
- receiving antennas (if possible)-beverage dir europe
3x K2 trx+IC7000.
3x linear IC,600 W out.
3x laptops.
Thats our max planing...........
Operating modes and frequencies*
* - proposed, so as not to interfere with other DX-pedition - +/- local QRM
|
© SP9UPK